Citations - Öncü Hazır

  • Cited Source:
    Berk E., Toy A.Ö., Hazır Ö " Single item lot-sizing problem for a warm/cold process with immediate lost sales," EUROPEAN JOURNAL OF OPERATIONAL RESEARCH , vol.187, no.3 pp. 1251-1267, JUN 2008.
    Citing Source:
    Diaz-Madronero, Manuel; Mula, Josefa; Peidro, David, A review of discrete-time optimization models for tactical production planning, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, Volume: 52, Issue: 17 Pages: 5171-5205, 2014
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E., Robust scheduling and robustness measures for the discrete time/cost trade-off problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Volume: 207, Issue: 2, Pages: 633-643, DEC 2010.
    Citing Source:
    Ma, Guofeng; Wang, Aimin; Li, Nan; et al., Improved Critical Chain Project Management Framework for Scheduling Construction Projects, JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT Volume: 140 Issue:12 , DEC 2014
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E., Robust scheduling and robustness measures for the discrete time/cost trade-off problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Volume: 207, Issue: 2, Pages: 633-643, DEC 2010.
    Citing Source:
    Gabrel, Virginie; Murat, Cecile; Thiele, Aurelie., Recent advances in robust optimization: An overview, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH Volume: 235, Issue: 3, Pages: 471-483, JUN 2014
  • Cited Source:
    Hazır Ö., Erel E., Gunalay Y., Robust optimization models for the discrete time/cost trade-off problem, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS , Volume: 130, Issue: 1, Pages: 87-95, MAR 2011
    Citing Source:
    Tavana, Madjid; Abtahi, Amir-Reza; Khalili-Damghani, Kaveh, A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems, EXPERT SYSTEMS WITH APPLICATIONS, Volume: 41 Issue: 4 Pages: 1830-1846, MAR 2014
  • Cited Source:
    Hazır Ö., Erel E., Gunalay Y., Robust optimization models for the discrete time/cost trade-off problem, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS , Volume: 130, Issue: 1, Pages: 87-95, MAR 2011.
    Citing Source:
    Li, Ming; Wu, Guangdong, Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects, ABSTRACT AND APPLIED ANALYSIS Article Number: 926913,2014
  • Cited Source:
    Hazır Ö., Shtub A., Effects of the information presentation format on project control, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY Volume: 62 Issue: 12 Pages: 2157-2161, DEC 2011.
    Citing Source:
    Acebes, Fernando; Pajares, Javier; Manuel Galan, Jose; et al., A new approach for project control under uncertainty. Going back to the basics, INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, Volume: 32, Issue: 3, Pages: 423-434, APR 2014
  • Cited Source:
    Chretienne, Philippe; Hazır, Ö; Kedad-Sidhoum, Safia, Integrated batch sizing and scheduling on a single machine, JOURNAL OF SCHEDULING, Volume: 14, Issue: 6, Pages: 541-555, DEC 2011.
    Citing Source:
    Pei, Jun; Liu, Xinbao; Pardalos, Panos M. et al., Application of an effective modified gravitational search algorithm for the coordinated scheduling problem in a two-stage supply chain, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Volume: 70, Issue: 1-4, Pages:335-348, JAN 2014
  • Cited Source:
    Hazır, Ö; Kedad-Sidhoum, Safia, Batch sizing and just-in-time scheduling with common due date, ANNALS OF OPERATIONS RESEARCH, Volume: 213, Issue: 1, Pages: 187-202, FEB 2014.
    Citing Source:
    Hwang, F. J.; Kovalyov, M. Y.; Lin, B. M. T., Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence, ANNALS OF OPERATIONS RESEARCH, Volume: 217, Issue: 1, Pages: 263-279, JUN 2014.
  • Cited Source:
    Hazır, Ö; Dolgui, A., Assembly line balancing under uncertainty: Robust optimization models and exact solution method, COMPUTERS & INDUSTRIAL ENGINEERING Volume: 65 Issue: 2 Pages: 261-267, JUN 2013
    Citing Source:
    Sivasankaran, P.; Shahabudeen, P., Literature review of assembly line balancing problems, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Volume: 73, Issue: 9-12 Pages:1665-1694, AUG 2014
  • Cited Source:
    Hazır, Ö; Dolgui, A., Assembly line balancing under uncertainty: Robust optimization models and exact solution method, COMPUTERS & INDUSTRIAL ENGINEERING Volume: 65 Issue: 2 Pages: 261-267, JUN 2013
    Citing Source:
    Hamta, N.; Ghomi, S. M. T. Fatemi; Tavakkoli-Moghaddam, R.; et al, A hybrid meta-heuristic for balancing and scheduling assembly lines with sequence-independent setup times by considering deterioration tasks and learning effect, SCIENTIA IRANICA Volume: 21 Issue: 3 Pages: 963-979,JUN 2014
  • Cited Source:
    Chretienne, Philippe; Hazır, Ö; Kedad-Sidhoum, Safia, Integrated batch sizing and scheduling on a single machine, JOURNAL OF SCHEDULING, Volume: 14, Issue: 6, Pages: 541-555, DEC 2011.
    Citing Source:
    Hazır, Ö; Kedad-Sidhoum, Safia, Batch sizing and just-in-time scheduling with common due date, ANNALS OF OPERATIONS RESEARCH, Volume: 213, Issue: 1, Pages: 187-202, FEB 2014.
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E., Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version, COMPUTERS & OPERATIONS RESEARCH, vol.37, no.4 pp. 649-655, APR 2010.
    Citing Source:
    Said, Samer S.; Haouari, Mohamed, A hybrid simulation-optimization approach for the robust Discrete Time/Cost Trade-off Problem, APPLIED MATHEMATICS AND COMPUTATION Volume: 259 Pages: 628-636 MAY 15 2015
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E. , Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version, COMPUTERS & OPERATIONS RESEARCH, vol.37, no.4 pp. 649-655, APR 2010.
    Citing Source:
    Hazir, Oncu; Dolgui, Alexandre, A decomposition based solution algorithm for U-type assembly line balancing with interval data, COMPUTERS & OPERATIONS RESEARCH Volume: 59 Pages: 126-131, JUL 2015
  • Cited Source:
    Hazır Ö., Gunalay Y., Erel E., Customer order scheduling problem: a comparative metaheuristics study, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 37, pp. 589-598, MAY 2008.
    Citing Source:
    Khanduzi, Raheleh; Peyghami, M. Reza; Maleki, H. Reza Solving continuous single-objective defensive location problem based on hybrid directed tabu search algorithm, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY Volume: 76 Issue: 1-4 Pages:295-310,JAN 2015
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E., Robust scheduling and robustness measures for the discrete time/cost trade-off problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Volume: 207, Issue: 2, Pages: 633-643, DEC 2010.
    Citing Source:
    Said, Samer S.; Haouari, Mohamed, A hybrid simulation-optimization approach for the robust Discrete Time/Cost Trade-off Problem, APPLIED MATHEMATICS AND COMPUTATION Volume: 259 Pages: 628-636 MAY 15 2015
  • Cited Source:
    Hazir, O, Shtub, A , Effects of the information presentation format on project control JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, Volume: 62, Issue: 12, Pages: 2157-2161, DEC 2011
    Citing Source:
    Hazir, Oncu, A review of analytical models, approaches and decision support tools in project monitoring and control, INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT Volume: 33 Issue: 4 Pages: 808-815, MAY 2015
  • Cited Source:
    Chretienne, Philippe; Hazır, Ö; Kedad-Sidhoum, Safia, Integrated batch sizing and scheduling on a single machine, JOURNAL OF SCHEDULING, Volume: 14, Issue: 6, Pages: 541-555, DEC 2011.
    Citing Source:
    Pei, Jun; Pardalos, Panos M.; Liu, Xinbao; et al.,COORDINATION OF PRODUCTION AND TRANSPORTATION IN SUPPLY CHAIN SCHEDULING JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION Volume: 11 Issue: 2 Pages: 399-419, APR 2015
  • Cited Source:
    Hazır Ö., Erel E., Gunalay Y., Robust optimization models for the discrete time/cost trade-off problem, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS , Volume: 130, Issue: 1, Pages: 87-95, MAR 2011.
    Citing Source:
    Al Haj, Rana A.; El-Sayegh, Sameh M., Time-Cost Optimization Model Considering Float-Consumption Impact JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT Volume: 141 Issue: 5 Article Number:04015001, MAY 2015
  • Cited Source:
    Hazır Ö., Erel E., Gunalay Y., Robust optimization models for the discrete time/cost trade-off problem, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS , Volume: 130, Issue: 1, Pages: 87-95, MAR 2011.
    Citing Source:
    Li, Hongbo; Xu, Zhe; Xiong, Li; et al., Robust Proactive Project Scheduling Model for the Stochastic Discrete Time/Cost Trade-Off Problem, DISCRETE DYNAMICS IN NATURE AND SOCIETY Article Number: 586087, 2015
  • Cited Source:
    Hazır Ö., Erel E., Gunalay Y., Robust optimization models for the discrete time/cost trade-off problem, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS , Volume: 130, Issue: 1, Pages: 87-95, MAR 2011.
    Citing Source:
    Said, Samer S.; Haouari, Mohamed, A hybrid simulation-optimization approach for the robust Discrete Time/Cost Trade-off Problem, APPLIED MATHEMATICS AND COMPUTATION Volume: 259 Pages: 628-636 MAY 15 2015
  • Cited Source:
    Hazır Ö., Erel E., Gunalay Y., Robust optimization models for the discrete time/cost trade-off problem, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS , Volume: 130, Issue: 1, Pages: 87-95, MAR 2011.
    Citing Source:
    Hazir, Oncu; Dolgui, Alexandre, A decomposition based solution algorithm for U-type assembly line balancing with interval data, COMPUTERS & OPERATIONS RESEARCH Volume: 59 Pages: 126-131, JUL 2015
  • Cited Source:
    Gurevsky, E.; Hazir, O; Battaia, O.; et al. Robust balancing of straight assembly lines with interval task times JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, Volume: 64 Issue: 11 Pages: 1607-1613, NOV 2013
    Citing Source:
    Copani, Giacomo; Leonesio, Marco; Tosatti, Lorenzo Molinari; et al. An integrated framework for combined designing dematerialised machine tools and production systems enabling flexibility-oriented business models INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING Volume: 28 Issue: 4 Special Issue: SI Pages: 353-363, APR 3 2015
  • Cited Source:
    Gurevsky, E.; Hazir, O; Battaia, O.; et al. Robust balancing of straight assembly lines with interval task times JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, Volume: 64 Issue: 11 Pages: 1607-1613, NOV 2013
    Citing Source:
    Makssoud, Fatme; Battaia, Olga; Dolgui, Alexandre; et al. ASSEMBLY AUTOMATION Volume: 35 Issue: 1 Special Issue: SI Pages: 16-21, 2015
  • Cited Source:
    Hazır Ö., Gunalay Y., Erel E., Customer order scheduling problem: a comparative metaheuristics study, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 37, pp. 589-598, MAY 2008
    Citing Source:
    Lin, Chi-Wei, Lin, Yang-Kuei; Hsieh, Han-Ting, Ant colony optimization for unrelated parallel machine scheduling, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Volume: 67, Pages: 35-45, JUL 2013
  • Cited Source:
    Hazır Ö., Gunalay Y., Erel E., Customer order scheduling problem: a comparative metaheuristics study, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 37, pp. 589-598, MAY 2008.
    Citing Source:
    Su, Ling-Huey; Chen, Ping-Shun; Chen, Szu-Yin, Scheduling on parallel machines to minimise maximum lateness for the customer order problem, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE Volume: 44 Issue: 5 Pages: 926-936, MAY 2013
  • Cited Source:
    Hazır Ö., Gunalay Y., Erel E., Customer order scheduling problem: a comparative metaheuristics study, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 37, pp. 589-598, MAY 2008.
    Citing Source:
    Kaplan, Sezgin; Rabadi, Ghaith, Simulated annealing and metaheuristic for randomized priority search algorithms for the aerial refuelling parallel machine scheduling problem with due date-to-deadline windows and release times, ENGINEERING OPTIMIZATION, Volume: 45 Issue: 1 Pages: 67-87, 2013
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E. , Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version, COMPUTERS & OPERATIONS RESEARCH, vol.37, no.4 pp. 649-655, APR 2010.
    Citing Source:
    Degirmenci, G.; Azizoglu, M., Branch and bound based solution algorithms for the budget constrained discrete time/cost trade-off problem, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY Volume: 64 Issue: 10, Pages: 1474-1484, OCT 2013
  • Cited Source:
    Berk E., Toy A.Ö., Hazır Ö " Single item lot-sizing problem for a warm/cold process with immediate lost sales," EUROPEAN JOURNAL OF OPERATIONAL RESEARCH , vol.187, no.3 pp. 1251-1267, JUN 2008.
    Citing Source:
    Caliskan-Demirag, Ozgun; Chen, Youhua ; Yang, Yi, Production-inventory control policy under warm/cold state-dependent fixed costs and stochastic demand: partial characterization and heuristics, ANNALS OF OPERATIONS RESEARCH Volume: 208 Issue: 1 Pages: 531-556, SEP 2013
  • Cited Source:
    Berk E., Toy A.Ö., Hazır Ö " Single item lot-sizing problem for a warm/cold process with immediate lost sales," EUROPEAN JOURNAL OF OPERATIONAL RESEARCH , vol.187, no.3 pp. 1251-1267, JUN 2008.
    Citing Source:
    Toy, Ayhan Ozgur; Berk, Emre, Dynamic lot sizing for a warm/cold process: Heuristics and insights, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Volume: 145, Issue: 1 Pages: 53-66,SEP 2013
  • Cited Source:
    Berk E., Toy A.Ö., Hazır Ö " Single item lot-sizing problem for a warm/cold process with immediate lost sales," EUROPEAN JOURNAL OF OPERATIONAL RESEARCH , vol.187, no.3 pp. 1251-1267, JUN 2008.
    Citing Source:
    Absi, Nabil; Detienne, Boris; Dauzere-Peres, Stephane, Heuristics for the multi-item capacitated lot-sizing problem with lost sales, COMPUTERS & OPERATIONS RESEARCH Volume: 40 Issue: 1 Pages: 264-272, JAN 2013
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E., Robust scheduling and robustness measures for the discrete time/cost trade-off problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Volume: 207, Issue: 2, Pages: 633-643, DEC 2010.
    Citing Source:
    Xiong, Jian; Xing, Li-ning; Chen, Ying-wu, Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Volume: 141, Pages: 112-126, JAN 2013
  • Cited Source:
    Hazır, Ö; Dolgui, A., Assembly line balancing under uncertainty: Robust optimization models and exact solution method, COMPUTERS & INDUSTRIAL ENGINEERING Volume: 65 Issue: 2 Pages: 261-267, JUN 2013
    Citing Source:
    Chica, Manuel; Cordon, Oscar; Damas, Sergio; et al., A robustness information and visualization model for time and space assembly line balancing under uncertain demand, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, Volume: 145 Issue: 2 Pages: 761-772, OCT 2013
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E. , Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version, COMPUTERS & OPERATIONS RESEARCH, vol.37, no.4 pp. 649-655, APR 2010.
    Citing Source:
    Hazır, Ö; Dolgui, A., Assembly line balancing under uncertainty: Robust optimization models and exact solution method, COMPUTERS & INDUSTRIAL ENGINEERING Volume: 65 Issue: 2 Pages: 261-267, JUN 2013
  • Cited Source:
    Hazır Ö., Erel E., Gunalay Y., Robust optimization models for the discrete time/cost trade-off problem, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS , Volume: 130, Issue: 1, Pages: 87-95, MAR 2011.
    Citing Source:
    Gurevsky, E.; Hazır, Ö; Battaia, O.; et al., Robust balancing of straight assembly lines with interval task times, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, Volume: 64, Issue: 11, Pages: 1607-1613, NOV 2013
  • Cited Source:
    Hazır Ö., Erel E., Gunalay Y., Robust optimization models for the discrete time/cost trade-off problem, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS , Volume: 130, Issue: 1, Pages: 87-95, MAR 2011.
    Citing Source:
    Hazır, Ö; Dolgui, A., Assembly line balancing under uncertainty: Robust optimization models and exact solution method, COMPUTERS & INDUSTRIAL ENGINEERING Volume: 65 Issue: 2 Pages: 261-267, JUN 2013
  • Cited Source:
    Hazır Ö., Erel E., Gunalay Y., Robust optimization models for the discrete time/cost trade-off problem, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS , Volume: 130, Issue: 1, Pages: 87-95, MAR 2011.
    Citing Source:
    Hazır, Ö; Schmidt, Klaus Werner, An integrated scheduling and control model for multi-mode projects, FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, Volume: 25, Issue: 1-2, Pages: 230-254, JUN 2013
  • Cited Source:
    Hazir Ö.; Gunalay Y., Erel E., Customer order scheduling problem: a comparative metaheuristics study, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 37, pp. 589-598, MAY 2008.
    Citing Source:
    Kaplan S.; Rabadi G. Exact and heuristic algorithms for the aerial refueling parallel machine scheduling problem with due date-to-deadline window and ready times, COMPUTERS & INDUSTRIAL ENGINEERING, vol. 62, 276-285, FEB 2012.
  • Cited Source:
    Hazir Ö.; Haouari, M.;Erel, E. , Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version, COMPUTERS & OPERATIONS RESEARCH, vol.37, no.4 pp. 649-655, APR 2010.
    Citing Source:
    Salmasnia, A.; Mokhtari, H.; Abadi, I. N. K., A robust scheduling of projects with time, cost, and quality considerations, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 60, 631-: MAY 2012
  • Cited Source:
    Hazır Ö., Gunalay Y., Erel E., Customer order scheduling problem: a comparative metaheuristics study, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 37, pp. 589-598, MAY 2008.
    Citing Source:
    Guldogan, Evrim Ursavas., " An integrated approach to machine selection and operation allocation problem," INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 55, no.5-8, pp. 797-805, JUL 2011.
  • Cited Source:
    Hazır Ö., Gunalay Y., Erel E., Customer order scheduling problem: a comparative metaheuristics study, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 37, pp. 589-598, MAY 2008.
    Citing Source:
    Liu, Li-Lan; Zhao, Gai-Ping; Ou'Yang, Shu-Sheng; et al., " Integrating theory of constraints and particle swarm optimization in order planning and scheduling for machine tool production," INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 57, no. 1-4, pp. 285-296, NOV 2011.
  • Cited Source:
    Hazır Ö., Gunalay Y., Erel E., Customer order scheduling problem: a comparative metaheuristics study, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 37, pp. 589-598, MAY 2008.
    Citing Source:
    Hazir, Oncu; Erel, Erdal; Gunalay, Yavuz., " Robust optimization models for the discrete time/cost trade-off problem," INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, vol. 130, no. 1, pp.87-95, MAR 2011.
  • Cited Source:
    Berk E., Toy A.Ö., Hazir Ö " Single item lot-sizing problem for a warm/cold process with immediate lost sales," EUROPEAN JOURNAL OF OPERATIONAL RESEARCH , vol.187, no.3 pp. 1251-1267, 2008.
    Citing Source:
    Witt, Andreas; Voss, Stefan, " Application of a mathematical model to an intermediate- to long-term real-world steel production planning problem based on standard software," EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING , vol. 5, no. 1, pp. 81-100, 2011.
  • Cited Source:
    Hazir Ö, Haouari, Mohamed, Erel, Erdal " Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version," COMPUTERS & OPERATIONS RESEARCH, vol.37, no.4 pp. 649-655, 2010.
    Citing Source:
    Weglarz, Jan; Jozefowska, Joanna; Mika, Marek; et al., " Project scheduling with finite or infinite number of activity processing modes - A survey," EUROPEAN JOURNAL OF OPERATIONAL RESEARCH , vol. 208, no. 3, pp. 177-205, FEB 2011.
  • Cited Source:
    Hazir O, Gunalay Y., Erel E., "Customer order scheduling problem: a comparative metaheuristics study," INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 37, pp. 589-598, 2008.
    Citing Source:
    Chen, Li-Shan, Application of cloud computing to learning, AFRICAN JOURNAL OF BUSINESS MANAGEMENT Volume: 4 Issue: 14 Pages: 3217-3225, OCT 18 2010
  • Cited Source:
    Hazir Ö, Gunalay Y., Erel E., "Customer order scheduling problem: a comparative metaheuristics study," INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 37, pp. 589-598, 2008.
    Citing Source:
    Su, Ling-Huey; Chen, Yu-His, Scheduling multioperation jobs on a single flexible machine, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, Volume: 42 Issue: 11-12 Pages:1165-1174, JUN 2009
  • Cited Source:
    Hazir Ö, Gunalay Y., Erel E., 2008, Customer order scheduling problem: a comparative metaheuristics study, International Journal of Advanced Manufacturing Technology, 37: 589-598.
    Citing Source:
    Chen, Li-Shan, Design and implementation of intelligent library system, LIBRARY COLLECTIONS ACQUISITIONS & TECHNICAL SERVICES Volume: 32 Issue: 3-4 Pages: 127-141, 2008
  • Cited Source:
    Berk E., Toy A.Ö., Hazir Ö " Single item lot-sizing problem for a warm/cold process with immediate lost sales," EUROPEAN JOURNAL OF OPERATIONAL RESEARCH , vol.187, no.3 pp. 1251-1267, 2008.
    Citing Source:
    Kim, Seong-in; Han, Junghee; Lee, Youngho; et al.Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum COMPUTERS & OPERATIONS RESEARCH Volume: 37 Issue: 2 Pages: 302-314, FEB 2010
  • Cited Source:
    Hazır Ö., Kedad-Sidhoum S., 2014, Batch Sizing and Just-In-Time Scheduling with Common Due Date, Annals of Operations Research, 123:1, 187-202.
    Citing Source:
    Luo, H, Fang, J , Huang, GQ, 2015, Real-time scheduling for hybrid flowshop in ubiquitous manufacturing environment, COMPUTERS & INDUSTRIAL ENGINEERING, 84, 12-23.
  • Cited Source:
    Hazır Ö, Haouari M, Erel, E, 2010, Robustness Measures and a Scheduling Algorithm for Discrete Time/Cost Trade-off Problem, European Journal of Operational Research, 207: 633–643.
    Citing Source:
    Ingels, J, Maenhout, B, The impact of reserve duties on the robustness of a personnel shift roster: An empirical investigation, COMPUTERS & OPERATIONS RESEARCH, 61, 153-169,SEP 2015
  • Cited Source:
    Hazır Ö., Gunalay Y., Erel E., Customer order scheduling problem: a comparative metaheuristics study, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, vol. 37, pp. 589-598, MAY 2008.
    Citing Source:
    Allahverdi A. The third comprehensive survey on scheduling problems with setup times/costs EUROPEAN JOURNAL OF OPERATIONAL RESEARCH Volume: 246 Issue: 2 Pages: 345-378 Published: OCT 16 2015
  • Cited Source:
    Hazır, Ö; Schmidt, Klaus Werner, An integrated scheduling and control model for multi-mode projects, FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, Volume: 25, Issue: 1-2, Pages: 230-254, JUN 2013
    Citing Source:
    Cohen, I. Iluz, M. When cost-effective design strategies are not enough: Evidence from an experimental study on the role of redundant goals OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE Volume: 56 Pages: 99-111 Published: OCT 2015
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E., Robust scheduling and robustness measures for the discrete time/cost trade-off problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Volume: 207, Issue: 2, Pages: 633-643, DEC 2010.
    Citing Source:
    Choi, Byung-Cheon; Park, Myoung-Ju, Min-Max Regret Version of the Linear Time-Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, Volume: 32, Issue: 5, OCT 2015
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E., Robust scheduling and robustness measures for the discrete time/cost trade-off problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Volume: 207, Issue: 2, Pages: 633-643, DEC 2010.
    Citing Source:
    Ma, Guofeng; Gu, Lingyun; Li, Nan, Scenario-Based Proactive Robust Optimization for Critical-Chain Project Scheduling, JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, Volume: 141, Issue: 10, OCT 2015
  • Cited Source:
    Hazır, Ö; Dolgui, A., Assembly line balancing under uncertainty: Robust optimization models and exact solution method, COMPUTERS & INDUSTRIAL ENGINEERING Volume: 65 Issue: 2 Pages: 261-267, JUN 2013
    Citing Source:
    Moreira, Mayron Cesar O.; Cordeau, Jean-Francois; Costa, Alysson M.; et al. Robust assembly line balancing with heterogeneous workers, COMPUTERS & INDUSTRIAL ENGINEERING Volume: 88 Pages: 254-263, OCT 2015
  • Cited Source:
    Hazır, Ö; Dolgui, A., Assembly line balancing under uncertainty: Robust optimization models and exact solution method, COMPUTERS & INDUSTRIAL ENGINEERING Volume: 65 Issue: 2 Pages: 261-267, JUN 2013
    Citing Source:
    Bentaha, Mohand Lounes; Battaia, Olga; Dolgui, Alexandre; et al. Second order conic approximation for disassembly line design with joint probabilistic constraints, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol: 247, PP: 957-967, DEC 2015
  • Cited Source:
    Hazir, Oncu, A review of analytical models, approaches and decision support tools in project monitoring and control INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, Volume: 33, Issue: 4, Pages: 808-815, MAY 2015.
    Citing Source:
    Acebes, Fernando; Pereda, Maria; Poza, David; et al. Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT Volume: 33, Pages: 1597-1609, OCT 2015
  • Cited Source:
    Hazir, Oncu, A review of analytical models, approaches and decision support tools in project monitoring and control, INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, Volume: 33, Issue: 4, Pages: 808-815, MAY 2015.
    Citing Source:
    Colin, Jeroen; Martens, Annelies; Vanhoucke, Mario; et al. A multivariate approach for top-down project control using earned value management DECISION SUPPORT SYSTEMS Volume: 79 Pages: 65-76, NOV 2015
  • Cited Source:
    Gurevsky, E.; Hazir, O; Battaia, O.; et al. Robust balancing of straight assembly lines with interval task times JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, Volume: 64 Issue: 11 Pages: 1607-1613, NOV 2013
    Citing Source:
    Kellegoz, Talip, Balancing Lexicographic Multi-Objective Assembly Lines with Multi-Manned Stations MATHEMATICAL PROBLEMS IN ENGINEERING Article Number: 9315024 Published: 2016
  • Cited Source:
    Hazır, Ö; Dolgui, A., Assembly line balancing under uncertainty: Robust optimization models and exact solution method, COMPUTERS & INDUSTRIAL ENGINEERING Volume: 65 Issue: 2 Pages: 261-267, JUN 2013
    Citing Source:
    Diagne, S.; Coulibaly, A.; De Beuvron, F. De Bertrand, Complex product modeling based on a Multi-solution eXtended Conceptual Design Semantic Matrix for behavioral performance assessment, COMPUTERS IN INDUSTRY Volume: 75 Pages: 101-115 Published: JAN 2016
  • Cited Source:
    Hazır, Ö; Dolgui, A., Assembly line balancing under uncertainty: Robust optimization models and exact solution method, COMPUTERS & INDUSTRIAL ENGINEERING Volume: 65 Issue: 2 Pages: 261-267, JUN 2013
    Citing Source:
    Chica, Manuel; Bautista, Joaquin; Cordon, Oscar; et al. A multiobjective model and evolutionary algorithms for robust time and space assembly line balancing under uncertain demand OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE Volume: 58 Pages: 55-68 Published: JAN 2016
  • Cited Source:
    Hazir, O, Shtub, A , Effects of the information presentation format on project control JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, Volume: 62, Issue: 12, Pages: 2157-2161, DEC 2011
    Citing Source:
    Mejia, Gonzalo; Nino, Karen; Montoya, Carlos; et al. A Petri Net-based framework for realistic project management and scheduling: An application in animation and videogames, COMPUTERS & OPERATIONS RESEARCH Vol: 66, pp: 190-198 FEB 2016
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E., Robust scheduling and robustness measures for the discrete time/cost trade-off problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Volume: 207, Issue: 2, Pages: 633-643, DEC 2010.
    Citing Source:
    Klansek, Uros, Mixed-Integer Nonlinear Programming Model for Nonlinear Discrete Optimization of Project Schedules under Restricted Costs JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT Vol: 142 Published: MAR 2016
  • Cited Source:
    Hazır Ö., Haouari, M., Erel, E. , Discrete time/cost trade-off problem: A decomposition-based solution algorithm for the budget version, COMPUTERS & OPERATIONS RESEARCH, vol.37, no.4 pp. 649-655, APR 2010.
    Citing Source:
    Aminbakhsh, Saman; Sonmez, Rifat, Discrete particle swarm optimization method for the large-scale discrete time-cost trade-off problem EXPERT SYSTEMS WITH APPLICATIONS Volume: 51 Pages: 177-185 Published: JUN 1 2016