Citations - Mehmet Rüştü Taner

  • Cited Source:
    B.Y Kara, M.R. Taner, "Hub Location Problems: The Location of Interacting Facilities," in Foundations of Location Analysis, (Edited by H.A. Eiselt and V. Marianov). pp: 273-288, Springer’s International Series in Operations Research and Management Science, Springer, 2011.
    Citing Source:
    Lueer-Villagra, Armin Marianov, Vladimir, A competitive hub location and pricing problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 231 (3), pp. 734-744, Dec, 2013.
  • Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE TRANSACTIONS, 34 (9), 803-811, Sep 2002.
    Citing Source:
    Schneider, Michael; Sand, Bastian; Stenger, Andreas, A note on the time travel approach for handling time windows in vehicle routing problems, COMPUTERS & OPERATIONS RESEARCH, vol. 40 (10), pp. 2564-2584, OCT 2013.
  • Cited Source:
    Samatlı-Paç G., Taner M.R., "The role of Repair Strategy in Warranty Cost Minimization: An Investigation via Quasi-renewal Processes," European Journal of Operational Research, vol. 197 (2), pp. 632-641, 2009.
    Citing Source:
    Shafiee, Mahmood; Chukova, Stefanka, Maintenance models in warranty: A literature review, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 229 (3), 561-572, SEP 2013.
  • Cited Source:
    Taner M.R., Karaşan O.E., and Yavuztürk E., “Scheduling Beams with Different Priorities on a Military Surveillance Radar,” IEEE Transactions on Aerospace and Electronic Systems, vol.48. no.2, 1725-1739, 2012.
    Citing Source:
    Bhat, Surendra S.; Narayanan, Ram M.; Rangaswamy, Muralidhar, Bandwidth Sharing and Scan Scheduling in Multimodal Radar with Communications and Tracking, IETE JOURNAL OF RESEARCH, vol. 59 (5), pp. 551-562, SEP-OCT 2013.
  • Cited Source:
    B.Y Kara, M.R. Taner, "Hub Location Problems: The Location of Interacting Facilities," in Foundations of Location Analysis, (Edited by H.A. Eiselt and V. Marianov). pp: 273-288, Springer’s International Series in Operations Research and Management Science, Springer, 2011.
    Citing Source:
    Lei, Ting L., Identifying Critical Facilities in Hub-and-Spoke Networks: A Hub Interdiction Median Problem, GEOGRAPHICAL ANALYSIS, vol. 45 (2), pp. 105-122, APR 2013.
  • Cited Source:
    Samatlı-Paç G., Taner M.R., "The role of Repair Strategy in Warranty Cost Minimization: An Investigation via Quasi-renewal Processes," European Journal of Operational Research, vol. 197 (2), pp. 632-641, 2009.
    Citing Source:
    van der Heijden, Matthieu; Iskandar, Bermawi P., Last time buy decisions for products sold under warranty, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 224 (2), pp. 302-312, JAN 16 2013.
  • Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE Transactions, 34 (9), 803-811, Sep 2002
    Citing Source:
    Lobo, Benjamin J.; Hodgson, Thom J.; King, Russell E.; Thoney, Kristin A.; Wilson, James R., An effective lower bound on L-max in a worker-constrained job shop, COMPUTERS & OPERATIONS RESEARCH, vol. 40 (1), pp. 328-343, JAN 2013.
  • Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE Transactions, 34 (9), 803-811, Sep 2002
    Citing Source:
    Lobo, Benjamin J.; Hodgson, Thom J.; King, Russell E.; Thoney, Kristin A.; Allocating job-shop manpower to minimize Lmax: Optimality criteria, search heuristics, and probabilistic quality metrics, COMPUTERS & OPERATIONS RESEARCH, vol. 40 (10), pp. 2569-2584, 2013.
  • Cited Source:
    B.Y Kara, M.R. Taner, "Hub Location Problems: The Location of Interacting Facilities," in Foundations of Location Analysis, (Edited by H.A. Eiselt and V. Marianov). pp: 273-288, Springer’s International Series in Operations Research and Management Science, Springer, 2011.
    Citing Source:
    Aros-Vera, Felipe; Marianov, Vladimir, Mitchell John E.; p-Hub approach for the optimal park-and-ride facility location problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 226, pp. 277-285, 2013.
  • Cited Source:
    Elmaghraby S.E., Fathi Y. and Taner M.R., "On the Sensitivity of Project Variability to Activity Mean Duration", International Journal of Production Economics 62 (3), pp. 219-232, 1999.
    Citing Source:
    Vanhoucke, M; An overview of recent research results and future research avenues using simulation studies in project management, ISRN COMPUTATIONAL MATHEMATICS, vol. 2013, 51549, SEP 11, 2013.
  • Cited Source:
    Elmaghraby S.E., Fathi Y. and Taner M.R., "On the Sensitivity of Project Variability to Activity Mean Duration", International Journal of Production Economics 62 (3), pp. 219-232, 1999.
    Citing Source:
    Vanhoucke, M; Schedule risk analysis, Project Management with Dynamic Scheduling, Springer, pp. 81-100, SEP 2013.
  • Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE TRANSACTIONS, 34 (9), 803-811, Sep 2002
    Citing Source:
    Lobo, Benjamin J.; Wilson, James R.; Thoney, Kristin A.; Hodgson, Thom J.; King, Russell E., A practical method for evaluating worker allocations in large-scale dual resource constrained job shops, IIE TRANSACTIONS, vol. 46 (11), pp. 1209-1226, 2014.
  • Cited Source:
    B.Y Kara, M.R. Taner, "Hub Location Problems: The Location of Interacting Facilities," in Foundations of Location Analysis, (Edited by H.A. Eiselt and V. Marianov). pp: 273-288, Springer’s International Series in Operations Research and Management Science, Springer, 2011.
    Citing Source:
    O’Kelly M.E.; Air freight hubs in the FedEx system: analysis of fuel use, JOURNAL OF AIR TRANSPORT MANAGEMENT, vol. 36, pp. 1-12, 2014.
  • Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE Transactions, 34 (9), 803-811, Sep 2002
    Citing Source:
    Lobo, Benjamin J.; Thoney, Kristin A.; King, Russell E., Wilson, James R.; A probabilistic characterization of allocation perfromance in a worker-constrained job shop; Essays in Production, Project Planning and Scheduling, International Series in Operations Research and Management Science, vol. 200, pp. 301-341, 2014.
  • Cited Source:
    Elmaghraby S.E., Fathi Y. and Taner M.R., "On the Sensitivity of Project Variability to Activity Mean Duration", International Journal of Production Economics 62 (3), pp. 219-232, 1999.
    Citing Source:
    Xin, Zi-ling; Pan, Xing, Research on the Project Critical Activity Uncertainty Risk Assessment, 60TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), Colorado Springs, CO, JAN 27-30, 2014.
  • Cited Source:
    Elmaghraby S.E., Fathi Y. and Taner M.R., "On the Sensitivity of Project Variability to Activity Mean Duration", International Journal of Production Economics 62 (3), pp. 219-232, 1999.
    Citing Source:
    Acebes, Fernando; Pajares, Javier; Galan, Jose Manuel; Lopez-Paredes, Adolfo, Exploring the influence of seasonal uncertainty in project risk management, Selected papers from the 27th IPMA, World Congress, Dubrovnik, Croatia, 2013, vol. 119, pp. 329-338, MAR 2014.
  • Cited Source:
    Taner M.R., Hodgson T.J., King R.E. and Schultz S.R., “Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure,” Computers and Industrial Engineering vol.52, pp.57-70, 2007.
    Citing Source:
    Sels, Veronique; Vanhoucke, Mario; A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups, COMPUTERS & OPERATIONS RESEARCH, vol.39 (10), pp. 2346-2358, OCT 2012.
  • Cited Source:
    Schultz S.R., Hodgson T.J., King R.E., Taner M.R., "Minimizing Lmax for the single machine scheduling problem with family set-ups," Int J of Production Research, vol. 42, pp. 4315-4330, 2004.
    Citing Source:
    Sels, Veronique; Vanhoucke, Mario; A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups, COMPUTERS & OPERATIONS RESEARCH, vol. 39 (10), pp.2346-2358, OCT 2012.
  • Cited Source:
    B.Y Kara, M.R. Taner, "Hub Location Problems: The Location of Interacting Facilities," in Foundations of Location Analysis, (Edited by H.A. Eiselt and V. Marianov). pp: 273-288, Springer’s International Series in Operations Research and Management Science, Springer, 2011.
    Citing Source:
    Yaman, Hande; Karasan, Oya Ekin; Kara, Bahar Y.; Release Time Scheduling and Hub Location for Next-Day Delivery, OPERATIONS RESEARCH, vol. 60 (4), pp. 906-917, JUL-AUG 2012.
  • Cited Source:
    Elmaghraby S.E., Fathi Y. and Taner M.R., "On the Sensitivity of Project Variability to Activity Mean Duration", International Journal of Production Economics 62 (3), pp. 219-232, 1999.
    Citing Source:
    Madadi, M.; Iranmanesh, H.; A management oriented approach to reduce a project duration and its risk (variability), EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 219 (3), pp.751-761, JUN 16 2012.
  • Cited Source:
    B.Y Kara, M.R. Taner, "Hub Location Problems: The Location of Interacting Facilities," in Foundations of Location Analysis, (Edited by H.A. Eiselt and V. Marianov). pp: 273-288, Springer’s International Series in Operations Research and Management Science, Springer, 2011.
    Citing Source:
    Campbell, James F.; O'Kelly, Morton E.; Twenty-Five Years of Hub Location Research, TRANSPORTATION SCIENCE, vol. 46 (2), pp. 153-169 , MAY 2012.
  • Cited Source:
    Taner M.R., Hodgson T.J., King R.E. and Schultz S.R., “Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure,” Computers and Industrial Engineering vol.52, pp.57-70, 2007.
    Citing Source:
    Prot, D.; Bellenguez-Morineau, O.; Tabu search and lower bound for an industrial complex shop scheduling problem, COMPUTERS & INDUSTRIAL ENGINEERING, vol. 62 (4), pp. 1109-1118, MAY 2012.
  • Cited Source:
    Taner M.R., Hodgson T.J., King R.E. and Thoney K.A., "Satisfying Due-Dates in a Job Shop with Sequence Dependent Family Setups", International Journal of Production Research, 41 (17), 4153-4169, 2003.
    Citing Source:
    Sels, Veronique; Gheysen, Nele; Vanhoucke, Mario; A comparison of priority rules for the job shop scheduling problem under different flow time- and tardiness-related objective functions, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, vol. 50 (15), pp. 4255-4270, 2012.
  • Cited Source:
    Schultz S.R., Hodgson T.J., King R.E., Taner M.R., "Minimizing Lmax for the single machine scheduling problem with family set-ups," Int J of Production Research, vol. 42, pp. 4315-4330, 2004.
    Citing Source:
    Habibeh Nazif, Lee Lai Soon; Optimized Crossover Genetic Algorithm to Minimize the Maximum Lateness of Single Machine Family Scheduling Problems, Journal of Asian Scientific Research, vol. 2 (5), pp. 240-253, 2012.
  • Cited Source:
    Samatlı-Paç G., Taner M.R., "The role of Repair Strategy in Warranty Cost Minimization: An Investigation via Quasi-renewal Processes," European Journal of Operational Research, vol. 197 (2), pp. 632-641, 2009
    Citing Source:
    González Díaz, V.; Crespo Márquez, A.; Pérès, F.; De Minicis, M.; Tronci, M.; Logistic support for the improvement of the warranty management, Advances in Safety, Reliability and Risk Management – Bérenguer, Grall; Guedes Soares (eds), Taylor & Francis Group, London, ISBN 978-0-415-68379-1, 2012.
  • Cited Source:
    Elmaghraby S.E., Fathi Y. and Taner M.R., "On the Sensitivity of Project Variability to Activity Mean Duration", International Journal of Production Economics 62 (3), 219-232, 1999.
    Citing Source:
    Shike Ren, Zhiping Yuan; Simulation Analysis of Criticality Indexes of Activities in GERT Networks, Fifth Intenational Conference on Business Intelligence and Financial Engineering (BIFE), Yu, L; Zhang, G; Wang, S ed.s, pp.567-571, 2012.
  • Cited Source:
    Elmaghraby S.E., Fathi Y. and Taner M.R., "On the Sensitivity of Project Variability to Activity Mean Duration", International Journal of Production Economics 62 (3), 219-232, 1999.
    Citing Source:
    Mario Vanhoucke, Project Management with Dynamic Scheduling, Springer, ISBN: 978-3-642-25174-0, 2012.
  • Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE Transactions, 34 (9), 803-811, Sep 2002
    Citing Source:
    Han, Xiotian, Allocating Manpowerwith Absolute Partial Labor Flexibility to Optimize a Lower Bound on Lmax in Job Shop Scheduling Problems, Master of Science Thesis, NCSU, http://www.lib.ncsu.edu/resolver/1840.16/7558, 2012.
  • Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE Transactions, 34 (9), 803-811, Sep 2002
    Citing Source:
    J. Behnamian, S.M.T. Fatemi Ghomi; Incorporating Transportation Time in Multi-agent Product Network Scheduling, International Journal of Computer Integrated Manufacturing 25 (12), 1111-1128, 2012.