Han, Xiotian, Allocating Manpowerwith Absolute Partial Labor Flexibility to Optimize a Lower Bound on Lmax in Job Shop Scheduling Problems, Master of Science Thesis, NCSU, http://www.lib.ncsu.edu/resolver/1840.16/7558, 2012. - Thoney K.A., Hodgson T.J., K

Citing Source: 
Han, Xiotian, Allocating Manpowerwith Absolute Partial Labor Flexibility to Optimize a Lower Bound on Lmax in Job Shop Scheduling Problems, Master of Science Thesis, NCSU, http://www.lib.ncsu.edu/resolver/1840.16/7558, 2012.
Cited Source: 
Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE Transactions, 34 (9), 803-811, Sep 2002

Citation type: 

  • Not including self-citations
TEDU Authors: 
Mehmet Rüştü Taner